Offshore Fabrications
PROJECTS

Past work

On deck, alongside and offshore around Darwin.

A selection of our work on vessels, wharves and offshore: structural repairs, deck plate, aluminium deck structures, and a bow door built from scratch.

PROJECT: A 7.5 TONNE BOW DOOR

3D model of the bow door with its plating hidden, showing the framing grid.
A 7.5 tonne replacement bow door
Built for a landing craft from the vessel's drawings, in two halves, then assembled on site with the hinges aligned. Blasted, coated with Interzone 954 at 500 microns and NDT tested.
See the bow door →

PROJECT: EXHAUST SUSPENSION AND MUFFLER REPLACEMENT

A full replacement of a vessel's exhaust suspension system: new mufflers, and new hangers on rubber vibration mounts from a DNV approved manufacturer, with expansion bellows to take up the heat movement. We measured both exhaust runs on board and had them drawn in 3D, so every hanger, bellows and flange sat where the drawing put it. When a batch of mounts arrived with a manufacturing fault, we had them replaced. We then put together the mount data sheets, the manufacturer's DNV approval and the material test certificates for the class surveyor, and saw the new pipework lagged.

DESIGN: BARGE HAUL-OUT ON AIRBAGS AND HEAVY-DUTY STOOLS

3D render of a landing craft ashore on airbags, with yellow heavy-duty stools set under the hull.
From water to heavy-duty stools
Our 3D design of a landing craft winched up a ramp on airbags, then let down onto heavy-duty stools on the hardstand, ready for survey and repairs. The method behind our modular airbag slipway, set up on your land.
See the design, stage by stage →

DESIGN: MARINE VESSEL CRADLES

Our 3D models for a vessel cradle that runs on wheeled bogies, linked by beams, to carry a vessel ashore. Each bogie in grade 300+ steel, welded to AS 1554.1 SP, blasted to Class 2.5 and coated with Interzone 954 at 500 microns in two coats, assembled on a jig so the wheels run true, with 10% of assemblies UT tested.

DESIGN: SEAWATER PIPE SPOOL

Our design for a seawater supply spool feeding an offshore support vessel's HCl scrubber, with the drawing approved by DNV GL. DN50 schedule 80 pipe branched off a DN80 tee through DN80 to DN50 reducers, six 90° elbows, four DIN 2501 PN10 flanges and a DNV approved gate valve. Quoted to DNV approved weld procedures with welder qualification tests, fabricated and pressure tested in the workshop, galvanised, and fitted on board with one day alongside so the vessel stayed in service.

DESIGN: VALVED BRANCH CONNECTION

PROJECT: A BRIDGE DECK TRAINING ROOM

Aluminium framing going up on a vessel's bridge deck, for a space that became a training room and a second living area for the crew. The video is the vessel's own, shared from Facebook.

The bridge deck, a month before the vessel sailed (September 2016).

ON THE JOB

Got a job like these?
Offshore Fabrications · Darwin, NT0472 921 798 · josiah@offshorefabrications.com.au
Photos are our own, from jobs around Darwin and offshore.